Building the world's thinking infrastructure.

250 MWPhase one · Allocated
1 GWApproved to build

Baseload Compute is the platform beneath the compute: power secured before anything is designed, campuses built to the hyperscalers' standard, owned and run by the people who built them.

Discover the platform
What we do

Most campuses are designed, then wait for power. Ours start with it: land, grid and allocation secured before the first drawing exists.

We build to the standard the world's largest operators hold themselves to, from the substation to the rack, with one team answerable for all of it.

Then we stay. We own the campus and we run it, on one standard, from the day the first rack draws power.

The platform

Everything between the grid and the GPU.

Six things every campus needs: land, power, connectivity, design, construction, operations. Most projects stitch them together from six parties. We hold all six, so nothing is handed off and nothing waits.

  • Land
  • Power
  • Connectivity
  • Design
  • Construction
  • Operations

Build-to-suit

Your specification, delivered on our site, on our power, by our team.

Capacity in the Baseload design

Our proprietary campus design, built ahead of demand and contracted by the megawatt. Specifications are shared under NDA.

We are owner-operators. The site, the power and the campus stay ours; hyperscalers and neoclouds take the capacity.

01.

Power

Grid allocation, connection and energy management, firmed by on-site generation where delivery demands it.

02.

Digital infrastructure

Hyperscale-class campuses, designed and constructed for power-dense compute, from the substation to the rack.

03.

Operations

Every site run to one operating standard, by the team that built it, from day one.

Development

250 MW allocated. 1 GW approved to build.

Phase one is 250 MW of grid power, allocated to us and ready to serve. The national regulator has approved the site to build out to 1 GW. It is the proof of the model, and the template for every market that follows.

  • Phase one250 MW allocated
  • Build-out1 GW approved
  • CampusIn development

Site and counterparty detail is shared under NDA.

Global platform

The site changes. The standard doesn't.

This is where the model is proven. Everything that makes it work, the design, the team, the way it's run, travels with us to the next market and the one after that.

  • Campus design
  • Delivery team
  • Operating standard

We enter a market on one condition: power secured ahead of demand. Where that holds, the platform repeats. Where it doesn't, we don't build.

  • Next marketsIn assessment